UNH Policies and Procedures Doc: Document is available at: https://docs.google.com/document/d/1rtSwpNKltVNyDKNWgeTV5gaYeDoAPlK-sfm8XE7o_5s/edit?usp=sharing I reviewed it and it looks good to me. Please add any comments to the google doc, or send them directly to Bob (ren@iol.unh.edu). Dashboard: Dashboard is in much better shape now and most tests are passing. We do need to monitor the results and determine if the tolerance is right. If it's too high then all tests will pass and we'll miss any genuine issues. If it's too low then we'll have too many tests failing when there isn't really a problem. Agreed that tuning the tolerance is the responsibility of each vendor. For Intel, we need to add the specific test config to the results page. We need to confirm the config details to Patrick, and he'll add this to the results pages. Other vendors may want to do something similar. Hardware: Shreyansh is almost ready to ship the NXP hardware. It should be in UNH in 2-3 weeks.