Hello All, Minutes from our meeting today. January 14, 2021 ################################################# Attendees 1. Lincoln Lavoie 2. Owen Hilyard 3. David Liu 4. Shepard Siegel 5. Brandon Lo 6. Aaron Conole 7. Trishan de Lanerolle 8. Zhaoyan Chen 9. Lijuan Tu 10. Ali Alnubani 11. Michael Santana 12. Thomas Monjalon 13. Bruce Richardson 14. Tomasz Zawadzki 15. Dial-in: 17813082169 ################################################# Agenda 1. CI Status 2. Bugzilla Status 3. Test Development 4. Any other business ################################################# Minutes ================================================= CI Status ------------------------------------------------- Intel Lab * Smoke tests are now enabled and results are being included in the reports to patch works. Running about 6 test cases right now. Check the patchworks reports for the specific details (showing up as intel-test in pathworks as the label). Recommend to add a link to the DTS test plan into the reports for each of the test cases that are being run. * Merge coming for pmdinfogen, which will add some additional python dependencies. Labs (UNH and Intel) will need to add these into the test systems / DUTs where necessary: https://patches.dpdk.org/cover/81614/ ------------------------------------------------- Github Actions / Travis CI / OBS * Github Actions have been running for about 1 month. Working on automating the process of checking the output and posting the results to patchworks. ETA is probably about 1 to 2 weeks away. * Planning to keep Travis CI around for now, specifically for the ARM builds. Hopefully, the amount of “free execution time” will be enough to cover the ARM builds. * OBS, still need a mechanism for timing out branches. This will get worked on once the Github Action work is completed. Will take 2 to 4 weeks, once started. ------------------------------------------------- UNH-IOL Community Lab * We are aware of pending patchsets on the dashboard and will be investigating those today. * Arm machines are now running compile and unit testing. ** Now focusing on implementing functional and performance testing using the NICs installed in the machine. ** Broken unit test case: https://bugs.dpdk.org/show_bug.cgi?id=612 * Mellanox systems are now running functional testing; we are currently monitoring these results for false negatives. We need to double check it sent an updated report to patchworks. * Feature request: how could maintainer request rerun of jobs, possibly through the dashboard. * Implemented a failure alert system to detect false failures quicker. * Testing failures will now report the last 20 lines of log output, example is here: http://mails.dpdk.org/archives/test-report/2021-January/174069.html * Patch for BUG-511 to categorize patches, to allow testing only applicable components, (i.e. code was a driver change vs a core change). https://mails.dpdk.org/archives/ci/2020-December/000902.html Needs to be reviewed and merged into dpdk-ci. ================================================= Bugzilla Status * https://bugs.dpdk.org/buglist.cgi?bug_status=UNCONFIRMED&bug_status=CONFIRMED&bug_status=IN_PROGRESS&columnlist=product%2Ccomponent%2Cpriority%2Cbug_status%2Cassigned_to%2Cshort_desc%2Cchangeddate&component=job%20scripts&component=UNH%20infra&component=Intel%20Lab&component=Travis%20CI&list_id=3419&order=priority%2Cchangeddate%20DESC&product=lab&query_format=advanced&resolution=--- ================================================= Test Development * Techboard is still working on developing priorities for 2021. ================================================= Any other business * Next Meeting: January 28, 2021 -- *Lincoln Lavoie* Senior Engineer, Broadband Technologies 21 Madbury Rd., Ste. 100, Durham, NH 03824 lylavoie@iol.unh.edu https://www.iol.unh.edu +1-603-674-2755 (m)