Update the test status for Intel part. dpdk24.03-rc2 all test is done. found five new issues. New issues: 1. loopback_virtio_user_server_mode: Failed to add vdev when launch dpdk-pdump -> has fix patch 2. DMA devices stats not reset after API testsuite -> has fix patch 3. https://bugs.dpdk.org/show_bug.cgi?id=1398 ptpclient causes NIC I225/I226 port RX missed -> has fix patch 4. meson_test/test_fasts: eal_flags_file_prefix_autotest and eal_flags_b_opt_autotest failed -> has fix patch 5. mdd_failure_diagnose/test_malicious_packet_segment_size: Failed to check size of mbuf segment on PF -> Intel dev is under investigating # Basic Intel(R) NIC testing * Build or compile: *Build: cover the build test combination with latest GCC/Clang version and the popular OS revision such as Ubuntu23.10, Ubuntu22.04.3, Fedora39, RHEL8.9/9.2, Centos7.9, FreeBSD14.0, SUSE15, OpenAnolis8.8, CBL-Mariner2.0 etc. - All test passed. *Compile: cover the CFLAGES(O0/O1/O2/O3) with popular OS such as Ubuntu22.04.3 and RHEL9.2. - All test passed with latest dpdk. * PF/VF(i40e, ixgbe): test scenarios including PF/VF-RTE_FLOW/TSO/Jumboframe/checksum offload/VLAN/VXLAN, etc. - All test case is done. found the fourth issue. * PF/VF(igc): test scenarios including PF/VF-RTE_FLOW/TSO/Jumboframe/checksum offload/VLAN/VXLAN, etc. - All test case is done. found the third issue. * PF/VF(ice): test scenarios including Switch features/Package Management/Flow Director/Advanced Tx/Advanced RSS/ACL/DCF/Flexible Descriptor, etc. - Execution rate is done. found the fourth and fifth issue. * Intel NIC single core/NIC performance: test scenarios including PF/VF single core performance test, RFC2544 Zero packet loss performance test, etc. - Execution rate is done. No new issue is found. * Power; IPsec; DLB; DSA dmadev: * Power: test scenarios including bi-direction/Telemetry/Empty Poll Lib/Priority Base Frequency, etc. - Execution rate is done. No new issue is found. * IPsec: test scenarios including ipsec/ipsec-gw/ipsec library basic test - QAT&SW/FIB library, etc. - Execution rate is done. No new issue is found. * DLB: test scenarios including DLB2/DLB2.5 - Execution rate is done. No new issue is found. * DSA dmadev: - Execution rate is done. found the second issue. # Basic cryptodev and virtio testing * Virtio: both function and performance test are covered. Such as PVP/Virtio_loopback/virtio-user loopback/virtio-net VM2VM perf testing/VMAWARE ESXI 8.0U1, etc. - Execution rate is done. found the first issue. * Cryptodev: *Function test: test scenarios including Cryptodev API testing/CompressDev ISA-L/QAT/ZLIB PMD Testing/FIPS, etc. - Execution rate is done. No new issue is found. *Performance test: test scenarios including Throughput Performance /Cryptodev Latency, etc. - Execution rate is done. No performance drop. Regards, Xu, Hailin