Update the test status for Intel part. dpdk24.03-rc2 all test is done. found five new issues.

 

New issues:

1. loopback_virtio_user_server_mode: Failed to add vdev when launch dpdk-pdump -> has fix patch

2. DMA devices stats not reset after API testsuite -> has fix patch

3. https://bugs.dpdk.org/show_bug.cgi?id=1398 ptpclient causes NIC I225/I226 port RX missed -> has fix patch

4. meson_test/test_fasts: eal_flags_file_prefix_autotest and eal_flags_b_opt_autotest failed -> has fix patch

5. mdd_failure_diagnose/test_malicious_packet_segment_size: Failed to check size of mbuf segment on PF -> Intel dev is under investigating

 

# Basic Intel(R) NIC testing

* Build or compile: 

 *Build: cover the build test combination with latest GCC/Clang version and the popular OS revision such as Ubuntu23.10, Ubuntu22.04.3, Fedora39, RHEL8.9/9.2, Centos7.9, FreeBSD14.0, SUSE15, OpenAnolis8.8, CBL-Mariner2.0 etc.

              - All test passed.

*Compile: cover the CFLAGES(O0/O1/O2/O3) with popular OS such as Ubuntu22.04.3 and RHEL9.2.

              - All test passed with latest dpdk.

* PF/VF(i40e, ixgbe): test scenarios including PF/VF-RTE_FLOW/TSO/Jumboframe/checksum offload/VLAN/VXLAN, etc.

              - All test case is done. found the fourth issue.

* PF/VF(igc): test scenarios including PF/VF-RTE_FLOW/TSO/Jumboframe/checksum offload/VLAN/VXLAN, etc.

              - All test case is done. found the third issue.

* PF/VF(ice): test scenarios including Switch features/Package Management/Flow Director/Advanced Tx/Advanced RSS/ACL/DCF/Flexible Descriptor, etc.

              - Execution rate is done. found the fourth and fifth issue.

* Intel NIC single core/NIC performance: test scenarios including PF/VF single core performance test, RFC2544 Zero packet loss performance test, etc.

              - Execution rate is done. No new issue is found.

* Power; IPsec; DLB; DSA dmadev:

 * Power: test scenarios including bi-direction/Telemetry/Empty Poll Lib/Priority Base Frequency, etc.

              - Execution rate is done. No new issue is found.

* IPsec: test scenarios including ipsec/ipsec-gw/ipsec library basic test - QAT&SW/FIB library, etc.

              - Execution rate is done. No new issue is found.

* DLB: test scenarios including DLB2/DLB2.5

              - Execution rate is done. No new issue is found.

* DSA dmadev:  - Execution rate is done. found the second issue.

# Basic cryptodev and virtio testing

* Virtio: both function and performance test are covered. Such as PVP/Virtio_loopback/virtio-user loopback/virtio-net VM2VM perf testing/VMAWARE ESXI 8.0U1, etc.

              - Execution rate is done. found the first issue.

* Cryptodev:

 *Function test: test scenarios including Cryptodev API testing/CompressDev ISA-L/QAT/ZLIB PMD Testing/FIPS, etc.

              - Execution rate is done. No new issue is found.

 *Performance test: test scenarios including Throughput Performance /Cryptodev Latency, etc.

              - Execution rate is done. No performance drop.

 

 

Regards,

Xu, Hailin